starts in confirm
from confirm, possible to get back to draft with reset signal, calling old set_to_draft, now
renamed holidays_reset, in the same workflow
from draft, possible to go to confirm
bzr revid: tde@openerp.com-20130805113023-1cs1s18dd5m4mi20